id: ADR-CMT-MTG-010
title: Reuse Shared File Preparation
product_area: committees
module: meetings
revision: 1
status: proposed
design_intent: confirmed
source_sha:
  services-committees: 36129c24daeaadcdb339218c38cdeaff9861359d
decision: >-
  Packet papers and minutes use shared managed file references, with a reserved
  document-library reference and the recorded interim policy permitting titled
  web links before the shared upload control is ready.
constrains:
  - DOM-CMT-MTG-001
  - DOM-CMT-MTG-002
  - WF-CMT-MTG-006
  - SVC-CMT-MTG-meetings
origin: >-
  CMTE-M3 D10 (Andrew 2026-10-21 10:23 ET),
  services-committees:docs/milestones/CMTE-M3-meetings-and-minutes.md#Decisions;
  architecture D-07 and Andrew 2026-10-19 (A2, A12)
alternatives:
  - option: Wait for the shared upload control before any packet work.
    why_not: That would make the whole milestone depend on another team’s delivery.
  - option: Create a local upload control.
    why_not: It would conflict with the selected shared-control boundary.
consequences:
  - >-
    The material path still needs evidence or implementation for the permitted
    title-and-link interim.
  - >-
    The stored reference shape reserves a later document-library link without
    proving that migration or integration is already built.
supersedes: []
evidence:
  - >-
    services-committees at 36129c24:
    modules/meetings/services/materials/material-assets.ts;
    db/meeting-materials.table.ts
---
# Reuse Shared File Preparation

## Context

Files belong to the shared asset lifecycle rather than a bespoke Committees upload system. The policy for interim links is separate from the current material schema, which does not establish that path.

## Decision

Packet papers and minutes use shared managed file references, with a reserved document-library reference and the recorded interim policy permitting titled web links before the shared upload control is ready.

## Alternatives Considered

Wait for the shared upload control before any packet work. That would make the whole milestone depend on another team’s delivery.

Create a local upload control. It would conflict with the selected shared-control boundary.

## Consequences

The material path still needs evidence or implementation for the permitted title-and-link interim. The stored reference shape reserves a later document-library link without proving that migration or integration is already built.