Open a recurring stream's first batch on create or reactivation
What It Does
First-batch work makes intake available immediately on activation rather than waiting for a future occurrence. Configuration saving is allowed to succeed when first-batch planning is refused, and the refusal belongs only to that response.
The Flow
When Something Fails
Only recognized planning refusal is isolated by the savepoint. Other failure can abort saving. The editor omits the refusal field, so the current interface can report saved configuration without explaining absent intake.
Open Design Questions
Product needs visible first-batch recovery and a decision on posting any predecessor retired by reactivation.