Skip to content

CAP-ACC-CLS-005Resolve ledger work that prevents closing

Markdown

CAP-ACC-CLS-005

Resolve ledger work that prevents closing

Markdown
  • DocumentDraft
  • Product intentConfirmed
  • ImplementationObserved

KindCapabilityProduct areaAccountingModuleMonth-End ClosingRevision1

Read atservices-accounting f47cb263react-console baf6dae3

The Formal Contract

The narrative above explains; the sections below are authoritative — the rules, scenarios and tests this document binds.

Outcomes
The checklist exposes transactions that have not reached a posted batch.Staff can locate each outstanding record and the work it requires.
Surfaces
consoleapi
Intent sources
services-accounting:docs/milestones/plans/ACCT-M4-plan.md#4a row 73 (class A: period ended, batches posted, transactions accounted)

Controls

18 controls apply, from the corpus control catalogue.

TC-IAM-001 TC-IAM-002 TC-IAM-004 TC-IAM-005 TC-AZ-001 TC-AZ-002 TC-AZ-003 TC-AZ-004 TC-AZ-006 TC-TEN-001 TC-TEN-002 TC-TEN-003 TC-LOG-002 TC-LOG-003 TC-LOG-004 TC-PI-001 TC-PI-002 TC-PI-005

Permissions

KeyChecked atScope
accounting.fiscal-periods.readapitenant

Business Rules

9 rules, 8 to be proved before approval. A rule's product intent is derived from its origin: 9 confirmed by a product decision, the rest inheriting this capability's confirmed.

IdRuleKindEnforced atProvenance
01must prove
Confirmed
The prior-periods check blocks for every earlier month that is not closed and presents those months in date order.
origin: fiscal-close design L2 (Rhythm 1.0 CLOSE-2 kept)
validationservicetest
services-accounting:modules/fiscal-close/tests/unit/readiness/period-rules.spec.js#is blocked by a period of an earlier year, and counts every one oldest first
02must prove
Confirmed
The ended-period check passes only after the month’s final day in the workspace time zone and identifies the first eligible closing date.
✓ September becomes eligible for the ended-period check on October’s first day.✗ The final day of September still fails the ended-period check.
origin: services-accounting:docs/milestones/plans/ACCT-M4-plan.md#4a row 73 (class A: period ended; departs from Rhythm 1.0, design R1)
validationservicetest
03must prove
Confirmed
The batches check blocks for batches in the period that are neither posted nor downloaded and includes their count in its explanation.
origin: services-accounting:docs/milestones/plans/ACCT-M4-plan.md#4a row 73 (class A: batches posted)
validationservicetest
04must prove
Confirmed
Archived batches prevent closure even though the earlier product allowed them.
origin: fiscal-close FC2-3 departure (archived batches block; no recorded ruling)
validationservicetest
services-accounting:modules/fiscal-close/tests/unit/carried/fiscal-years/logic/validate-period-closing-batches.spec.js#2.0: is blocked by the archived batch of 1.0's baseline, which 1.0 let through
05must prove
Confirmed
Outstanding batches identify the next action for their state, including closing, posting, waiting, retrying or restoring.
policyservicetest
06must prove
Confirmed
Deferred revenue and cost of goods sold system batches owned by the close are excluded from outstanding batches, including after reopening.
policyservicetest
services-accounting:modules/fiscal-close/tests/unit/readiness/batches-posted.spec.js#never counts the close’s own open system batches, deferred revenue and COGS, as unposted
07must prove
Confirmed
The transactions check includes eligible invoices, payments, credits, credit applications, refunds, memos and write-offs dated in the period when their batch is absent, unposted or failed; draft and pro forma invoices are excluded.
origin: services-accounting:docs/milestones/plans/ACCT-M4-plan.md#4a row 73 (class A: transactions accounted)
validationservicetest
08must prove
Confirmed
Each outstanding transaction identifies its posting problem and links to the corresponding record.
policyservicetest
09
Confirmed
Outstanding transactions return no customer name in the current readiness response.
policyserviceobserved

Scenarios

IdGivenWhenThenProvenance
01September contains twenty-three open batches and an invoice without a batch.Readiness runs on October’s third day.Batch and transaction checks expose the outstanding work while the ended-period check passes.test
services-accounting:modules/fiscal-close/tests/integration/services/readiness/evaluate-readiness.integration.spec.js#names the open earlier period, the unaccounted invoice and reconciliation’s blocker unchanged
02October’s final day has not passed.Staff evaluate October.The ended-period check prevents closure until November’s first day.test

The Markdown files under specs/ in rhythmsoftware/rhythm-v2-docs are the canonical source of truth. This reader is a generated, read-only projection of them.