Move a connection to another release
What It Does
A release update checks a target deployment before changing the account pin. Only newly introduced access is compared with the preceding declaration and customer acceptance. Successful verification refreshes features and dependent bindings.
The Flow
When Something Fails
Present the refused request on account detail. The existing release pin remains. Refuse newly requested access outside existing declaration or acceptance. The target is not submitted for verification. Retain the old release and record verification failure. The provider check may have run while the original pin remains. Rollback a failed result write. No partial pin or binding reassessment commits.
Open Design Questions
Product must decide whether release updates should recheck all target access against current acceptance rather than only newly introduced access.