Capacity grant lifecycle
The Lifecycle
Transitions Explained
Temporary capacity adds credits or exempts a declared operation from its operation switch. Its state is calculated from timestamps and revocation. Default windows end at the organization’s next month boundary. An exemption does not enable organization-wide AI when that switch is off.
What Cannot Happen
Supported APIs do not edit or delete grants and reject repeated or late revocation. A new grant is required to restore revoked capacity. The state labels describe calculated eligibility rather than scheduled writes.
Concurrency and Timing
Peak validation checks the new start and relevant overlapping starts inside its window. Admission evaluates active capacity directly. End or revocation preserves the holds of work already admitted.