Prepare and operate workspace applications: Capability Test Specification
Coverage
The category map distinguishes authored scenarios from unresolved proof obligations. A bound scenario names an existing executable suite; its recorded result remains unrun.
Interactions With Related Capabilities
Keep a commercial grant when preparation fails. The grant remains recorded while the application presents its failed readiness.
Separate licensing from operational resumption. The commercial standing remains traceable while availability follows the operational change.
Retain lifecycle failure evidence. Both records identify the failed work without silently reopening its final history.
Preserve retirement scope. Retirement removes owned resources while its retained work still explains the deletion.
Remove readiness and exceptions while retaining purge evidence. The removed workspace has no licensing-owned operational resources while retained deletion history remains inspectable.
Evidence and Boundaries
Pinned assertion sources support the listed executable bindings. Proposed cases retain the proof required beyond those boundaries. Structured obligations name incomplete object, transition and permission trace; row-level concurrency proof does not establish complete workflow serialization.